Parr-instrument HTM Manuale Utente

Navigare online o scaricare Manuale Utente per Sensori Parr-instrument HTM. Parr Instrument HTM User Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 4
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
Installation Instructions for
High Temperature Cut-Off Module (HTM)
557M
Meter Installation in 4848 Reactor
Controller
1. Unplug the power cord of the 4848 Controller.
Remove the (2) screws located on the top/front
cover at the rear corners of the controller. Gen-
tly lift the cover forward, which is hinged at the
bottom, taking care not to apply tension on any
internal wiring.
2. If applicable, remove and discard the black hole
plug on the sloped front panel above the “TEM-
PERATURE” text. This can be done by pinching
the clasps on the back of the plug from the inside
of the front plate.
3. Insert the meter (2082E) through the panel cut-
out, from outside in, making sure the rubber
gasket is on the outside of the controller front
panel. (If wires are preinstalled, remove the
terminal connector by releasing the tabs on the
sides of the module and gently pulling the termi-
nal connector off. Reference photos below.) Slide
the white mounting bracket onto the module with
the mounting screws pointing towards the front
panel. Slide the mounting bracket forward until
it touches the controller panel. The clasps on the
mounting bracket should align with the groves
on the module. Gently tighten the screws until
the module is held into place. (If removed, reat-
tach the terminal connector.)
Terminal Connector Removal
Vedere la pagina 0
1 2 3 4

Sommario

Pagina 1 - Controller

Installation Instructions for High Temperature Cut-Off Module (HTM)557MMeter Installation in 4848 Reactor Controller1. Unplug the power cord of the 4

Pagina 2 - HTM Installation

HTM InstallationParr Instrument Company27 8 9 10 11 121 2 3 4 5 62082E Pin Out(Pin 5 is blank)Meter Installation in 4848 Reactor Controller (Continued

Pagina 3

HTM Installationwww.parrinst.com3Wiring Installation in 4848 Reactor ControllerWarning: Take care not to apply too much torque when tightening down o

Pagina 4 - High Temperature Module - HTM

High Temperature Module - HTMKeys command:1. Press “SET” to select 2. Press return key move to next operation mode3. Up/Down arrow keys to adjust v

Commenti su questo manuale

Nessun commento